Release ledger
Canonical Atlas record
TS 29.212
Policy and Charging Control (PCC); Reference points
Release evolution
Compare evidence between releases
Use indexed version, Work Item and Change Request evidence to see what changed around this specification. This is an evidence trail, not a clause-by-clause normative diff.
Rel-15 snapshot
Work affecting this release
85 indexed Change Requests · 1 connected Work Item.
Showing 12 CR records from the available cross-release sample. Browse release CR records (JSON) →
CR 1695 — Correct transit failure code for UE suspension
CR 1690 rev.1 — draft-ietf-dime-load published as RFC 8583
CR 1686 — Correction to MISSING_FLOW_INFORMATION
CR 1680 — removal of userLocationInfoTime from UeCampingRep
CR 1686 rev.1 — Correction to MISSING_FLOW_INFORMATION
CR 1679 rev.1 — TDF application report when the PFDs are removed or modified
CR 1679 — TDF application report when the PFDs are removed or modified
CR 1679 rev.2 — TDF application report when the PFDs are removed or modified
CR 1686 rev.2 — Correction to MISSING_FLOW_INFORMATION
CR 1675 rev.1 — Correction of CR implementation error related to the PFDs management
CR 1675 — Correction of CR implementation error related to the PFDs management
CR 1676 — Correction of Extended-Max-Requested-BW-UL to Extended-Max-Requested-BW-DL within DL description
Version history
Indexed versions
Showing 60 of 181 indexed versions.
Atlas classifications
Meaning and provenance
No Atlas classifications have been attached yet.
Work Items
Standards work connected to TS 29.212
Provisioning of IP-based multimedia services
WLAN-UMTS Interworking Rel-6
Deleted - TR for PCC
Evolution of policy control and flow based bearer level charging
Stage 2 for PCC
Evolution of Policy Control and Charging
Gx reference point for Policy and Charging Control
Study on 3GPP System Architecture Evolution
Deleted - Stage 3 for PRIOR
Stage 3 CIMS_3GPP2 (CT3)
Stage 3 CIMS_3GPP2 (CT1)
Stage 2/3 for Network selection procedures
Deleted - CT4 aspects of SAES
Deleted - CT3 aspects of SAES
3GPP System Architecture Evolution Specification - Evolved Packet System (non RAN aspects)
Stage 2 Security Architecture
Deleted - Issues for CT4 TR 29.803
Issues for CT3 TR 29.804
Issues for CT1 TR 24.801
Core specification for CT6 aspects of SAE
CT6 aspects of SAE
Stage 3 (CT4) of SAE impact on existing capabilities
Stage 3 for SAE / LTE identities
Stage 3 (CT1) for SAE impact on services, network functions and capabilities
Stage 3 SAE impact on existing capabilities
CS Fallback in EPS
System enhancements for the use of IMS services in local breakout
Stage 3 for UE Non-Access-Stratum (NAS) mobility procedures in idle and active mode
Stage 3 for EPC - HSS interface
Stage 3 for QoS mechanisms
Stage 3 for security aspects of LTE Access
Stage 3 for Session management, bearer control and QoS aspects
CT4 Stage 3 for protocol between EPCs
Stage 2 GPRS for EPC (23.060, etc.)
Stage 3 for EPC to UTRAN
Stage 3 for EPC - GPRS
Stage 3 for Inter-system mobility between E-UTRAN and 2G/3G
Stage 3 for MME - SGSN signalling free protocol
Stage 3 for Inter-system mobility between E-UTRAN and CDMA2000
Stage 3 for EPC to 3GPP2
CT4 Stage 3 for GTP v2 protocol
CT4 Stage 3 for PMIP protocol within EPC
Mobile IPv4 (MIPv4) based Mobility protocols
Stage 3 for Inter-system mobility between E-UTRAN and non 3GPP accesses
(IETF) Stage 3 for Mobility management based on DSMIPv6 (RFC6275)
(IETF) Stage 3 for Mobility management based on DSMIPv6 (draft-ietf-mip6-hiopt)
Stage 3 for Mobility management based on DSMIPv6
(IETF) Stage 3 for Interfaces EPC - non-3GPP IP access
Stage 3 for AAA/HSS related
Stage 3 for EPC - AAA interface
Stage 3 for Access to the EPC via non-3GPP access networks
Stage 3 security aspects for MIPv4 Access
Stage 3 security aspects for DSMIPv6 Access
Stage 2 Security aspects for non-3GPP Access
Stage 3 for Mobility management based on MIP v4
Stage 3 for interfaces within EPC
Stage 3 for Interfaces EPC - non-3GPP IP access
Deleted - CT1 aspects of SAES
Deleted - CT aspects of SAES
Stage 3 PCC within SAE
Support for IMS Emergency Calls over GPRS and EPS
CT3 aspects - Stage 3 for IMS Emergency Calls over GPRS and EPS
Multiple PDN Connection to the Same APN for PMIP-based Interfaces
PCC enhancements
(Small) Technical Enhancements and Improvements for Rel-9
CT3 aspects of Completion of IMS Restoration Procedures
CT3 part of Stage 3 for IP Flow Mobility and seamless WLAN offload
Deleted - CT3 part of Stage 3 for Network Improvements for Machine-Type Communications
CT3 part of PCRF failure and restoration
Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Databases
CT3 aspects of Policy Enhancements for Sponsored Connectivity and Coherent Access to Policy related Databases
Deleted - Registration in Densely-populated area (RED)
CT3 part of Stage 3 for S2b Mobility based on GTP
(Small) Technical Enhancements and Improvements for Rel-10
CT3 part on Stage 3 on enhancements for Multimedia Priority Service
Support for BroadBand Forum Accesses Interworking
CT3 part of Stage 3 BB I: BBF interworking with home routed traffic for WLAN and H(e)NB
Stage 3 BB I - Core Network impacts: BBF interworking with home routed traffic for WLAN and H(e)NB
Stage 3 BB II - Core Network impacts: BBF interworking with offload in access network for WLAN and for H(e)NB
CT3 part of Stage 3 BB II: BBF interworking with offload in access network for WLAN and for H(e)NB
Deleted - CT3 part of Stage 3 BB III: BBF convergence and network based mobility
Network-provided Location information for IMS (NETLOC)
CT3 part of CT aspects of Network-provided Location information for IMS
QoS Control Based on Subscriber Spending Limits
CT3 aspects of QoS Control Based on Subscriber Spending Limits (Stage 3)
Service Awareness and Privacy Policies
CT3 part of Service Awareness and Privacy Policies
CT3 part of Stage 3 BB1: Reachability Aspects of SIMTC
Deleted - CT3 part of CN aspects of Service Identification for RRC Improvements in GERAN
S2a Mobility based On GTP and WLAN access to EPC
CN aspects of Mobility based On GTP & PMIPv6 for WLAN access to EPC
CT3 part of CN aspects of Mobility based On GTP & PMIPv6 for WLAN access to EPC
(Small) Technical Enhancements and Improvements for Rel-11
CT3 part of enhanced Nodes Restoration for EPC
CT3 aspects of Single Radio Video Call Continuity for 3G-CS
Application Based Charging
CT3 aspects of Application Based Charging (Stage 3)
CT3 part of CT aspects of Core Network Overload User Location Information reporting improvements
LTE Coverage Enhancements
CT3 part of Overload Control for PCC based Diameter applications
CT3 part of Group Communication System Enablers for LTE
LTE TDD-FDD joint operation including Carrier Aggregation
CT3 part of Network-provided Location information for IMS Trusted WLAN Access Network (TWAN) case
Policy and Charging Control for supporting fixed broadband access networks
CT3 part of Stage 3 for BB1: Policy and Charging Control for supporting traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks
Stage 3 for BB1: Policy and Charging Control for supporting traffic from fixed terminals and NSWO traffic from 3GPP UEs in fixed broadband access networks
CT3 part of PCRF based solution
(Small) Technical Enhancements and Improvements for Rel-12
CT3 aspects of Usage Monitoring Control PCC enhancement (Stage 3)
Flexible Mobile Service Steering
CT3 Aspect of Flexible Mobile Service Steering
(Small) Technical Enhancements and Improvements for Rel-13
CT3 part of CT aspects of User Plane Congestion Management for BB1
Continuation of the Overload Control for PCC based Diameter applications
CT3 Aspect of Usage Monitoring Control extension
(Small) Technical Enhancements and Improvements for Rel-14
CT aspects of 5G System - Phase 1
Wireless and Wireline Convergence for the 5G system architecture
Historical association · verification pendingCoverage and Handoff Enhancements for Multimedia
(Small) Technical Enhancements and Improvements for Rel-16
Enhancement of 5G PCC related services
Architecture support for NB-IoT/eMTC Non-Terrestrial Networks in EPS
Historical association · verification pendingMultimedia Priority Service (MPS) Phase 2
Historical association · verification pending(Small) Technical Enhancements and Improvements for Rel-17
Enhancement of 5G PCC related services in Rel-17
NR RedCap UE with long eDRX for RRC_INACTIVE State
(Small) Technical Enhancements and Improvements for Rel-18
IMS Disaster Prevention and Restoration Enhancement
CT aspects for integration of satellite components in the 5G Phase 4
General Packet Radio Service
OAM Principles and High-level Requirements
End-to-end UMTS Quality of Service management
Knowledge graph
Related standards
No graph edges indexed yet. The graph API is available at this JSON endpoint.