Release ledger
Canonical Atlas record
TS 32.442
Telecommunication management; Trace Management Integration Reference Point (IRP); Information Service (IS)
Release evolution
Compare evidence between releases
Use indexed version, Work Item and Change Request evidence to see what changed around this specification. This is an evidence trail, not a clause-by-clause normative diff.
Rel-10 snapshot
Work affecting this release
18 indexed Change Requests · 3 connected Work Items.
Showing 12 CR records from the available cross-release sample. Browse release CR records (JSON) →
CR 0014 rev.1 — CR R10 32.442 Support multiple cells in area based MDT
CR 0014 rev.2 — Support multiple cells in area based MDT
CR 0016 — CR R10 32.442 Add TCE address for UTRAN MDT activation
CR 0016 rev.1 — CR R10 32.442 Add TCE address for UTRAN MDT activation
CR 0016 rev.2 — Add TCE address for UTRAN MDT activation
CR 0019 rev.1 — Inconsistency correction on trace target - Align with 32.422
CR 0214 — Rel-10 CR TS32.442 Alignment of the Anonymization parameter with TS 32.422
CR 0218 — Rel10 CR 32442 Add missing threshold params for UMTS event triggered measurements
CR 0218 rev.1 — Add missing threshold parameter for UMTS event triggered measurements
CR 0225 — CR R10 32.442 Correction of UMTS M2 reporting trigger configuration -Align with 32.422
CR 0225 rev.1 — Correction of UMTS M2 reporting trigger configuration -Align with 32.422
CR 0234 — Rel-10 CR 32.442 Editorial corrections
Version history
Indexed versions
Showing 33 of 33 indexed versions.
Atlas classifications
Meaning and provenance
No Atlas classifications have been attached yet.
Work Items
Standards work connected to TS 32.442
Rel-4 Charging and OAM&P
Rel-5 Performance Management
Rel-5 Charging Management & Operations, Administration, Maintenance and Provisioning (OAM&P)
Performance Management
Rel-6 Operations, Administration, Maintenance and Provisioning (OAM&P)
Deleted - duplicated with UID 35063 - IRP for Subscriber and Equipment Trace Management
IRP for Subscriber and Equipment Trace Management
Rel-7 Operations, Administration, Maintenance and Provisioning (OAM&P)
Rel-7 Trace Management
Subscriber and Equipment Trace for E-UTRAN and EPC
Rel-8 Operations, Administration, Maintenance and Provisioning (OAM&P)
IRP SOAP Solution Sets continuation from Rel-8
SA5 aspects of Management of UE based network performance measurements
Management of UE based network performance measurements
Rel-10 Operations, Administration, Maintenance and Provisioning (OAM&P)
Enhanced Management of UE based network performance measurements
Rel-11 Operations, Administration, Maintenance and Provisioning (OAM&P)
OAM aspects of Network Sharing
Rel-12 Operations, Administration, Maintenance and Provisioning (OAM&P)
Compliance of 3GPP SA5 specifications to the NGMN Top Operational Efficiency (OPE) Recommendations
TS work on Compliance of 3GPP SA5 specifications to the NGMN Top Operational Efficiency (OPE) Recommendations
Enhanced Network Management (NM) centralized Coverage and Capacity Optimization
Operations, Administration, Maintenance and Provisioning (OAM&P)
Knowledge graph
Related standards
No graph edges indexed yet. The graph API is available at this JSON endpoint.