Release ledger
Canonical Atlas record
TS 22.179
Mission Critical Push to Talk (MCPTT); Stage 1
Release evolution
Compare evidence between releases
Use indexed version, Work Item and Change Request evidence to see what changed around this specification. This is an evidence trail, not a clause-by-clause normative diff.
Rel-14 snapshot
Work affecting this release
27 indexed Change Requests · 1 connected Work Item.
Showing 12 CR records from the available cross-release sample. Browse release CR records (JSON) →
CR 0046 rev.1 — Clarifications and corrections to audio cut-in
CR 0037 rev.1 — CR TS 22.179 V14.0.0 (2016-03) Mission Critical Push to Talk over LTE for Realignment (MCPTT-R)
CR 0038 — Inclusion of “first-to-answer” commencement mode for private calls
CR 0038 rev.2 — Inclusion of “first-to-answer” commencement mode for private calls
CR 0038 rev.3 — Inclusion of “first-to-answer” commencement mode for private calls
CR 0039 — Removing distinction of with and without floor control for priority when interrupted by emergency calls
CR 0039 rev.2 — Removing distinction of with and without floor control for priority when interrupted by emergency calls
CR 0040 — Introduction of Audio cut-in requirements in MCPTT
CR 0041 — Introduction of Audio cut-in requirements in MCPTT
CR 0042 — Audio Cut-in Regroup requirement
CR 0043 — Remove definitions for participant and participant type in MCPTT TS 22.179 that are being added to MCCoRe TS 22.280.
CR 0043 rev.1 — Remove definitions for participant and participant type in MCPTT TS 22.179 that are being added to MCCoRe TS 22.280.
Version history
Indexed versions
Showing 38 of 38 indexed versions.
Atlas classifications
Meaning and provenance
No Atlas classifications have been attached yet.
Work Items
Standards work connected to TS 22.179
Awaiting formal work item
Stage 1 for MCPTT
Mission Critical Push To Talk over LTE (MCPTT)
Mission Critical Push to Talk over LTE Realignment
Study on Future Railway Mobile Communication System
Removal of 'over LTE' limitation from Mission Critical Specifications
Complete Gap Analysis for Railways Mobile Communication System
(Small) Technical Enhancements and Improvements for Rel-17
Stage 1 of Railways specific Enhancements to Mission Critical Services
Study on FRMCS Phase 5
Stage 1 for Ambient listening enhancements including pause and resume in MCS
FRMCS Phase 6
Study on FRMCS Phase 6
Stage 1 for FRMCS Phase 7
Knowledge graph
Related standards
No graph edges indexed yet. The graph API is available at this JSON endpoint.