Release ledger
Canonical Atlas record
TS 22.179
Mission Critical Push to Talk (MCPTT); Stage 1
Release evolution
Compare evidence between releases
Use indexed version, Work Item and Change Request evidence to see what changed around this specification. This is an evidence trail, not a clause-by-clause normative diff.
Rel-15 snapshot
Work affecting this release
21 indexed Change Requests · 2 connected Work Items.
Showing 12 CR records from the available cross-release sample. Browse release CR records (JSON) →
CR 0058 rev.1 — Updates to the wording in the specification to clarify that the requirements are applicable from LTE onwards
CR 0057 — Removing 'over LTE' from the title of the specification
CR 0050 — Introduction of FRMCS requirements: Initiate and control voice communication
CR 0058 — Updates to the wording in the specification to clarify that the requirements are applicable from LTE onwards
CR 0056 — Allowing a MCX User to select overriding multi talker requests manually
CR 0055 rev.3 — Correction on behavior of groups configured for multi talker control wrt groups using public safety floor control
CR 0055 rev.2 — Correction on behavior of groups configured for multi talker control wrt groups using public safety floor control
CR 0055 — Correction on behavior of groups configured for multi talker control wrt groups using public safety floor control
CR 0054 rev.2 — Clarify MCPTT group in 6.2.3.7
CR 0054 rev.1 — Editorial changes for 6.2.3.7 multi-talker control
CR 0054 — Editorial changes for 6.2.3.7 multi-talker control
CR 0053 — Introduction of FRMCS intoTS 22.179 MCCoRe: Enhancing chapter 5.13 with FRMCS media quality aspects Stage 1
Version history
Indexed versions
Showing 38 of 38 indexed versions.
Atlas classifications
Meaning and provenance
No Atlas classifications have been attached yet.
Work Items
Standards work connected to TS 22.179
Awaiting formal work item
Stage 1 for MCPTT
Mission Critical Push To Talk over LTE (MCPTT)
Mission Critical Push to Talk over LTE Realignment
Study on Future Railway Mobile Communication System
Removal of 'over LTE' limitation from Mission Critical Specifications
Complete Gap Analysis for Railways Mobile Communication System
(Small) Technical Enhancements and Improvements for Rel-17
Stage 1 of Railways specific Enhancements to Mission Critical Services
Study on FRMCS Phase 5
Stage 1 for Ambient listening enhancements including pause and resume in MCS
FRMCS Phase 6
Study on FRMCS Phase 6
Stage 1 for FRMCS Phase 7
Knowledge graph
Related standards
No graph edges indexed yet. The graph API is available at this JSON endpoint.