Release ledger
Canonical Atlas record
TS 28.567
Management and orchestration; Management Aspects of Closed Control Loops
Release evolution
Compare evidence between releases
Use indexed version, Work Item and Change Request evidence to see what changed around this specification. This is an evidence trail, not a clause-by-clause normative diff.
Rel-19 snapshot
Work affecting this release
25 indexed Change Requests · 1 connected Work Item.
Showing 12 CR records from the available cross-release sample. Browse release CR records (JSON) →
CR 0017 — Rel-19 CR TS 28.567 Correction on Stage-3 CCLReport
CR 0013 — Rel-19 CR TS 28.567 Update clause 4.3 to align with the approved pCR
CR 0011 rev.1 — Rel-19 CR TS28.567 Small corrections
CR 0010 rev.1 — Rel-19 CR TS 28.567 Remove duplicated attribute
CR 0008 rev.1 — R19 CR TS 28.567 correction on CCL IOC
CR 0007 rev.1 — R19 CR TS 28.567 clarification on CCL scopes
CR 0006 rev.1 — Rel-19 CR TS28.567 Clarify CCL relation to intents
CR 0001 rev.2 — Rel-19 CR TS28.567 Clarify CCL-related MnS
CR 0003 rev.1 — Rel-19 CR TS 28.567 Correction on CCL Purpose
CR 0002 rev.1 — Rel-19 CR TS28.567 Small corrections
CR 0004 — Rel-19 CR TS 28.567 Correction on Stage-3 Fault Management CCL
CR 0006 — Rel-19 CR TS28.567 Clarify CCL relation to intents
Version history
Indexed versions
Showing 15 of 15 indexed versions.
Atlas classifications
Meaning and provenance
No Atlas classifications have been attached yet.
Work Items
Standards work connected to TS 28.567
Closed Control Loop Management
Closed Control Loop Management Phase 2
Study on Closed Control Loop Management phase 2
(Small) Technical Enhancements and Improvements for Rel-20
Knowledge graph
Related standards
No graph edges indexed yet. The graph API is available at this JSON endpoint.