Compare evidence between releases
Use indexed version, Work Item and Change Request evidence to see what changed around this specification. This is an evidence trail, not a clause-by-clause normative diff.
Rel-20 snapshot
Work affecting this release
22 indexed Change Requests · 3 connected Work Items.
Showing 12 CR records from the available cross-release sample. Browse release CR records (JSON) →
CR 0023 rev.2 — Rel-20 CR TS28.567 Relations of CCLs, NDT & AIML
CR 0026 rev.1 — Rel-20 CR TS 28.567 Corrections for CCL for Multi-domain Energy Efficiency Optimization
CR 0025 rev.1 — Rel-20 CR TS 28.567 Corrections for Network Maintenance CCL
CR 0024 rev.1 — Rel-20 CR TS 28.567 Stage2 and Stage3 alignment
CR 0021 rev.1 — Rel-20 CR TS 28.567 DraftCR to CR CCLM Stage 2 and 3
CR 0020 rev.1 — Rel-20 CR TS 28.567 CCL for capacity optimization Stage 3
CR 0019 rev.1 — Rel-20 CR TS 28.567 CCL for capacity optimization
CR 0022 — Rel-20 CR TS28.567 Relations of CCLs to other automation enablers
CR 0014 rev.1 — Rel-20 CR 28.567 Fix issues with alarm identification
CR 0027 — Rel-20 CR TS28.567 Correct Missing Heading
CR 0023 rev.1 — Rel-20 CR TS28.567 Relations of CCLs, NDT & AIML
CR 0023 — Rel-20 CR TS28.567 Relations of CCLs, NDT & AIML
Version history
Indexed versions
Showing 15 of 15 indexed versions.
Atlas classifications
Meaning and provenance
No Atlas classifications have been attached yet.
Work Items
Standards work connected to TS 28.567
Closed Control Loop Management
Closed Control Loop Management Phase 2
Study on Closed Control Loop Management phase 2
(Small) Technical Enhancements and Improvements for Rel-20
Knowledge graph
Related standards
No graph edges indexed yet. The graph API is available at this JSON endpoint.